Bi-parting cantilever gates for an airport perimeter in the Maldives
A 22 m clear opening in tropical, salt-laden air, delivered as two synchronized 16.5 m leaves.

22 m
required clear opening
2 x 11 m
clear opening per leaf
16.5 m
total length of each leaf
50%
shorter opening time than one leaf
The challenge
An international airport in the Maldives needed a 22 m clear opening for special equipment and oversized vehicles. The site sits in a tropical marine climate with high salinity and humidity, so corrosion resistance was a hard requirement.
Airport security also set strict limits on opening time. A single leaf long enough for 22 m would have taken too long to open during peak periods.

Our solution
Our engineering team replaced the single leaf with a bi-parting system: two leaves with 11 m clear opening each and 16.5 m total length per side.
The leaves use 6005-T6 high-strength aluminum with AkzoNobel industrial anti-corrosion coating and a double cure. The 7.0 mm bottom beam and precision balancing keep the leading edge level with zero sag, and an integrated controller runs both leaves in sync with an infrared safety array.
Results
Opening time
Cut in half
Compared with one leaf
Leading edge
Zero sag
At 16.5 m leaf length
Coating
AkzoNobel
Double-cured for salt air
Control
Synchronized
Infrared safety array